Thus, the statement that ‘ Women exposed to air pollution give birth to smaller babies’ is misleading. However, it does not establish a causal link between pollution or greenness and birthweight. “This study shows that exposure to higher air pollution during pregnancy is associated with lower birthweight (on average) and living in a greener area during pregnancy is associated with higher birthweight (on average). Without seeing the full report it is difficult to comment further on this work.”ĭr Rosie Cornish, Senior Research Fellow in Population Health Sciences at the Bristol Medical School, University of Bristol, said: “These preliminary findings are consistent with many previous studies from around the world suggesting that higher levels of particulate air pollution are associated with low birth weight, and that access to green space is beneficial. RELATED: Sewer main upgrade slowed traffic last fallĭo you have something to add to this story, or a news tip? us on Facebook and follow us on Twitter.Expert reaction to unpublished abstract and poster on air pollution and birth weightĪn unpublished study presented at the European Respiratory Society International Congress 2023 looks at the relationship between high air pollution and low birth weight.ĭr George Savva, Senior Research Scientist at Quadram Institute Bioscience, said: “A cold patch was the only option at the time, the contractor will return when the weather is more suitable to mill and properly pave the trench,” Blain added. “The sanitary sewer work went deeper than a water main replacement, which increased the length of time to complete the project and required more extensive dewatering,” said David Blain, director of planning and engineering with the City of Chilliwack.Īfter a delay of several weeks during the weather disaster, the sewer project was completed in December. The road is still set to see hot mix repaving to create a smoother surface once the weather warms up. One aspect that many of the posters had wrong however was thinking that the roadwork was completed. So project delays are to blame it turns out, not shoddy workmanship. The relentless rain made it impossible for the city contractor to finish the work deep in the trench as the groundwater kept rising. ![]() ![]() 19 but the entire project had to be put on hold after the record-setting rainfall of Nov. The Chilliwack Progress has learned the work would have been completed by Nov. Many of the more than 100 comments on a Facebook group post this week were critical of the rough patch job, including one poster who called it a “horribly bumpy road” for “a few hundred yards.”Īnother poster joked: “Had to go back and pick my spine up off the road. The temporary “cold patch” asphalt used in December to close the trench is now garnering complaints from drivers who bounce over it, but the rutted state of the road is only temporary. Disastrous flooding in November is partly to blame for the “horribly bumpy” state of a Chilliwack roadway at the busy intersection of Yale Road and Hocking Avenue.Ī deep trench was excavated in the northbound lane of Yale last October, followed by partial road closures to allow the contractor to upgrade the sewer main underground.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |